A family business


Technology and passion in hot forging since 1968. Excellence in every detail.

Targeted investments, state-of-the-art equipment and consolidated know-how have allowed Cavaletto Spa to present itself on the market as a leader in hot forging.

Company Numbers

75

employees

8,5K

tonnes processed

22 Mln

turnover

5,5 Mln

pieces produced

15%

of the products is a finished machined piece

15.000 mq

covered area

18

production lines with presses from 400 to 2,000 tonnes

Timeline

The company was founded by brothers Mario and Aldo Cavaletto in 1968 in Salassa, in the Canavese region, where it is still based today. Their adventure in hot steel forging began with a friction screw press, an electric upsetter and a lot of goodwill. Moulds and tooling are prepared by Mario himself, while Aldo does the actual moulding. The moulds produced in those years were mainly for automotive parts and the agricultural sector. The goal set by the two brothers right from the beginning was, where possible, to innovate production processes with continuous investments in new technologies. This idea was kept alive by the younger generation.

 

  • 1984 The cold forging department goes into operation

  • 1987 First paper-based management scheduling system

  • 1996 Commissioning of the first gas cogeneration plant

  • 1999 Our desire to ensure product and process quality led us to obtain the ISO 9001 certification

  • 1999 Installation of the first automated warehouse for equipment management

  • 2001 Purchase of a three-dimensional coordinate measuring machine

  • 2003 Significant expansion of the production plant: 17 production lines

  • 2005 Introduction of the new computerised management system

  • 2010 Upgrade of the automated three-dimensional controlling machine

  • 2011 Installation of a photovoltaic system (365Kw) with disposal of Eternit roofing

  • 2015 Our commitment to environmental protection allowed us to obtain the ISO 14001 certification

  • 2017 Purchase of a three-dimensional scanning measuring machine

  • 2018 Expansion of the raw materials warehouse to an area of 11,000 m2

  • 2019 Installation of the 18th hot forging line

    The sixth production centre for moulds and 4.0 tooling comes into operation

  • 2021 Expansion of the raw materials warehouse (15,000 m2 in total)

  • 2023 Development of the photovoltaic park with the integration of 570 kW of power